數(shù)控焊接設(shè)備的維修檢查步驟
來源:http://maxsenz.com/ 發(fā)布時(shí)間:2023-02-23 瀏覽次數(shù):0
山東數(shù)控焊接設(shè)備的維修檢查可以使用直觀法檢查,根據(jù)電器元件故障的外部表現(xiàn),通過看、聞、聽等手段檢查判斷故障的方法。下面來講講其相關(guān)步驟:
The maintenance and inspection of Shandong CNC welding equipment can be carried out by visual method. According to the external performance of the electrical component failure, the method of judging the failure can be checked by means of seeing, smelling and listening. Here are the relevant steps:
①調(diào)查情況:向操作者和故障發(fā)生時(shí)的在場(chǎng)人員詢問情況,包括故障外部表現(xiàn)、大致部位以及發(fā)生故障時(shí)的環(huán)境情況。如有無異常操作、明火、熱源等是否靠近電器元器件、有無腐蝕性氣體侵入、有無漏水、是否有人修理過以及修理的內(nèi)容等。
① Investigation: ask the operator and the personnel present at the time of the fault, including the external performance of the fault, the approximate location and the environmental conditions at the time of the fault. For example, whether there is abnormal operation, whether the open fire, heat source, etc. are close to the electrical components, whether there is corrosive gas invasion, whether there is water leakage, whether someone has repaired, and the repair content.
②初步檢查:根據(jù)調(diào)查的情況,查看有關(guān)電器元器件外部有無損壞、連線有無斷路、松動(dòng),絕緣有無燒焦,螺旋熔斷器的熔斷指示器是束跳出,電器元器件有無進(jìn)水和油垢,開關(guān)位置是否正確等。
② Preliminary inspection: according to the investigation, check whether the external parts of relevant electrical components are damaged, whether the wiring is open or loose, whether the insulation is burnt, whether the fuse indicator of the spiral fuse is bunched out, whether the electrical components are free of water and oil dirt, and whether the switch position is correct.
③試焊:通過初步檢查,確認(rèn)沒有可能使故障進(jìn)一步擴(kuò)大和造成人身、設(shè)備事故后,可以通電。穩(wěn)定無異常情況后,可進(jìn)一步做焊接試驗(yàn)檢查,焊機(jī)在正常工作中要注意有無嚴(yán)重跳水、異常氣味和異常聲音等現(xiàn)象,一經(jīng)發(fā)現(xiàn)應(yīng)立即停止,切斷電源。注意檢查電器元器件的溫升及電器元器件的動(dòng)作程序是否符合焊接設(shè)備原理圖的要求,從而發(fā)現(xiàn)故障部位。
③ Test welding: after confirming that there is no possibility of further expansion of the fault and causing personal and equipment accidents through preliminary inspection, power can be turned on. After the welding machine is stable and free of abnormal conditions, further welding test inspection can be carried out. During the normal operation of the welding machine, pay attention to whether there is serious diving, abnormal smell, abnormal sound and other phenomena. Once found, immediately stop and cut off the power supply. Pay attention to check whether the temperature rise of electrical components and the action procedure of electrical components meet the requirements of the schematic diagram of welding equipment, so as to find the fault location.
對(duì)焊接設(shè)備故障的檢查和維修排除,要按照相關(guān)要求做好記錄。方便以后類似故障發(fā)生后的檢查、日常維護(hù)保養(yǎng)和故障排除的經(jīng)驗(yàn)積累,也為以后更新、添置時(shí)作為合格供應(yīng)方產(chǎn)品的業(yè)績(jī)檔案和選擇產(chǎn)品和生產(chǎn)單位的依據(jù)。
The inspection, repair and troubleshooting of welding equipment shall be recorded according to relevant requirements. It is convenient to accumulate the experience of inspection, routine maintenance and troubleshooting after the occurrence of similar faults in the future, and also serves as the basis for the performance archives of qualified suppliers' products and the selection of products and production units when they are updated and added in the future.
以上一些檢查事項(xiàng),要視情況靈活運(yùn)用,但必須遵守操作規(guī)章,防止在設(shè)備維修過程中出現(xiàn)人身、設(shè)備傷害事故,并且盡可能兩人操作和監(jiān)護(hù)。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://maxsenz.com咨詢吧!
The above inspection items should be flexibly applied according to the situation, but the safety operation regulations must be observed to prevent personal and equipment injury accidents during the equipment maintenance process, and two people should operate and monitor as much as possible. Come to our website for more relevant content http://maxsenz.com Ask!
上一篇:數(shù)控焊接設(shè)備如何能助推機(jī)械制造業(yè)?
下一篇:焊接專機(jī)設(shè)備保養(yǎng)哪些部位非常重要?