通過結(jié)構(gòu)了解到數(shù)控焊接設(shè)備的注意事項
來源:http://maxsenz.com/ 發(fā)布時間:2023-01-14 瀏覽次數(shù):0
數(shù)控焊接設(shè)備的結(jié)構(gòu)組成由焊接電源、焊接機(jī)頭、焊件移動或變?yōu)檠b置、輔助裝置(送絲裝置、焊機(jī)回收輸送裝置、拖鏈、支架、電氣控制等)。通過結(jié)構(gòu)可以了解到山東數(shù)控焊接設(shè)備的注意事項:
The structure of numerical control welding equipment consists of welding power supply, welding head, weldment moving or transforming device, auxiliary device (wire feeding device, welding machine recycling and conveying device, drag chain, support, electrical control, etc.). Through the structure, we can understand the precautions of Shandong CNC welding equipment:
1.為了保證焊接精度,焊接平臺需要定期清理,避免粘上油污等。
1. In order to ensure the welding accuracy, the welding platform needs to be cleaned regularly to avoid oil contamination.
2.設(shè)備要保證平穩(wěn),調(diào)整好位置避免精度受到影響。
2. The equipment shall be stable, and the position shall be adjusted to avoid the impact of accuracy.
3.在設(shè)備運行的同時要注意觀察焊接情況,防止發(fā)生焊接意外。操作工不可以閑談,玩手機(jī)等干于工作無關(guān)的事。
3. Pay attention to observe the welding condition while the equipment is running to prevent welding accidents. Operators are not allowed to chat, play mobile phones and other things unrelated to work.
4.操作工要穿戴防護(hù)用品,焊接溫度以及電氣故障帶電情況會對人身造成一定威脅。
4. Operators shall wear protective equipment. Welding temperature and electrical fault electrification may pose a certain threat to personal health.
5.送絲裝置或者送料裝置出現(xiàn)故障要及時停止,斷電檢查其工作情況。
5. The wire feeding device or feeding device should be stopped in time in case of failure, and the power should be cut off to check its working condition.
6.數(shù)控焊接設(shè)備周圍要避免雜物,防止電源或電線受損發(fā)生意外。
6. Sundries shall be avoided around the NC welding equipment to prevent accidents caused by power or wire damage.
7.在通電情況下不可以自行打開數(shù)控控制箱及各種線路,防止觸電。
7. It is not allowed to open the NC control box and various lines by itself when the power is on to prevent electric shock.
此外操作人員要注意,在離開崗位前和下班前要關(guān)閉電源和氣源,防止他人隨意操作。遇到焊接問題,及時上報領(lǐng)導(dǎo)聯(lián)系廠家,做出方案才可調(diào)整。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://maxsenz.com咨詢吧!
In addition, the operator should pay attention to turning off the power and gas supply before leaving the post and after work to prevent others from operating at will. In case of welding problems, timely report to the leader to contact the manufacturer and make a plan before adjustment. Come to our website for more relevant content http://maxsenz.com Ask!